Home / Gold Recovery from Ore

Gold Recovery from Ore

Ore applications should begin with a clear understanding of mineralogy, gold liberation, interfering elements and the plant’s existing process route.

Circuits for Evaluation

  • Heap leaching for suitable, permeable feed
  • Vat leaching for controlled batch operation
  • Agitated leaching in CIL/CIP circuits
  • Pregnant-solution recovery by activated carbon, resin, cementation or electrowinning

Key Test Parameters

Parameter Purpose
Particle size Balance liberation, grinding cost and permeability
pH and alkalinity Maintain stable conditions and control reagent demand
Reagent concentration Avoid under-dosing and unnecessary consumption
Residence time Identify the economic recovery point
Recovery method Select an appropriate route for the pregnant solution
Safety note: Operating figures in the application manual are starting points for controlled testwork, not general instructions for industrial operation.

Metallurgical Test Programme